Duncan Ward

Structural Engineer

Duncan joined Madsen Giersing in 2011 as a structural design engineer. Since joining Madsen Giersing, Duncan has been involved in the design of various temporary and permanent marine structures including wharves, harbours, loading facilities, floating structures, canti-travellers, piling construction aids, temporary bridges, temporary berthing structures, navigation aids as well as feasibility, scoping studies and alternative design development for major marine projects in Australia and South-East Asia.

  • Bachelor of Engineering (Civil) (Hons)
  • Bachelor of Science (Mathematics)
  • Member of the Institution of Engineers, Australia
  • BHP Tug Harbour, WA
  • Goro Ocean Outfall Upgrade & Repair, New Caledonia
  • Napa Napa Wharf, PNG
  • Abbot Point T3 Coal Terminal, QLD
  • Lekir Bulk Terminal, Export Wharf for Lime Kiln Feed, Malaysia
  • Paraburdoo Stockpile Retaining wall, WA
  • Sir Hubert Murray Stadium, PNG
  • Darwin East Arm Port Expansion, NT
  • Wiggins Island Coal Export Terminal, QLD
  • Gladstone LNG Jetty, QLD